Previous Page  5 / 32 Next Page
Information
Show Menu
Previous Page 5 / 32 Next Page
Page Background

NEWS FROM THE CHAMBERS

NEWS FROM THE CHAMBERS

CROSSOVERS

Residents are advised that the Shire policy in regard to crossovers is as follows:-

Crossovers

For both town and rural properties where a culvert is essential to provide access from a property to a

public road, only one culvert of adequate length as determined by the Works Manager is to be

supplied free of charge. The cost of all other culverts or any additional length is to be met by the

landholder.

Crossovers – Urban Areas

1) A standard crossing as referred to by Regulation 15 of the Uniform Local provisions

Regulations comprises either:

a) A 150mm compacted and water bound gravel driveway sealed with one coat of bitumen

emulsion and topped with blue metal or metal dust,

b) 100mm reinforced concrete over a compacted sub base,

c) Brick paving, or

d) Other as approved by Council.

2)

The minimum width of the standard crossing shall be 3.0 metres for residences, 4.0 metres

for commercial, 4.5 metres for light industrial, 6.0 metres for heavy industrial and 7.5

metres for service stations each with a 1.5 metre radius “fishtail” onto the kerb line.

3)

The gradient shall be positive 2% for the first 1.5 metres from the kerb line, then not exceed

plus or minus 2% to the property line.

4)

Where not defined the specifications shall conform to Standard Vehicle Crossover

specifications as approved by the Works Manager.

5)

The Shire of Victoria Plains will bear 50% of the cost of a standard crossing either in cash or

work provided of a standard crossing to a landholding or property for the first such crossing

only.

6)

Where Shire staff are to construct the crossover and except where credit arrangements are

approved by the Chief Executive Officer prepayment by the ratepayers of their 50%

contribution is required.

7)

Where a ratepayer elects to construct greater than the crossover as defined in (1) and (2)

the Shires contribution shall not exceed 50% of the crossing as defined in those paragraphs.

8)

A budget allocation be made in each year to allow Shires contribution to crossovers.

9)

The Shire will comply with requests for crossovers on a first come, first served basis within

budget provisions.

CHANGE OF DATE

JUNE COUNCIL MEETING

Will be held in the Council Chambers,

on Wednesday

14th June 2017